您现在的位置:首页 > 知识库 > 石油天然气 >石油测井工程技术中的标准操作程序(英文) 夏学锋,孙中原著 2018年版
石油测井工程技术中的标准操作程序(英文) 夏学锋,孙中原著 2018年版

石油测井工程技术中的标准操作程序(英文) 夏学锋,孙中原著 2018年版

资料大小: 127.24 MB
文档格式: PDF文档
资料语言: 英文版
资料类别: 石油天然气
更新日期: 2023-11-17
下载说明:
推荐信息: 原著   操作   石油   中的   程序

本地下载(10点)  备用下载(10点)

内容简介
石油测井工程技术中的标准操作程序(英文)
作 者: 夏学锋,孙中原
出版时间: 2018

内容简介
  This book aims to teach the Petroleum logging employees the standard operating procedure (SOP) in Petroleum Logging Engineering Technology. The book is divided into eleven chapters. The eleven chapters named, respectively, Openhole Wireline Logging SOP, Pipe conveyed logging SOP, Fishing Operation SOP, Vertical Seismic Profile SOP, Free Point Indicator SOP, Bridge Plug Setting SOP Truck Preventive Maintenance 1 SOP Truck Preventive Maintenance 2 SOP, Truck Preventive Maintenance 3 SOP, Wireline Converyed Perforating SOP and Tubing Conveyed Perforating SOEThis book narrates the standard operating procedure (SOP) from the whole process of petroleum logging engineering in detail. It can be used as a guidance book in petroleum logging employees work and would improve their operation standardization and security.This book also should attract the attention of the managers in petroleum Logging industry, both domestic and abroad. They could supervise their employees whether operate in a standard procedure and teach them what the correct procedure is.Whats more, this book also could be used for the students, who prepare to engage in the industry work, as a self-study book in Petroleum University.
目录
Chapter 1 Openhole Wireline Logging SOP
1.1 Preparation at Bace
1.2 Mobilization
1.3 Preparation at Wellsite
1.4 Logging Operations
1.5 Post]obWellsite Procedure
1.6 Demobilization
Chapter 2 Pipe Conveyed Logging SOP
2.1 Preparation at Base
2.2 Mobilization
2.3 Preparation at Wellsite
2.4 Operations
2.5 Post lob Wellsite Procedure
2.6 Demobilization
Chapter 3 Fishing Operation SOP
3.1 Preparation at Base
3.2 Mobilization
3.3 Preparation at Wellsite
3.4 Operations
3.5 Post]ob Wellsite Procedure
3.6 Demobilization
Chapter 4 Vertical Seismic Profile SOP
4.1 Preparation at Base
4.2 Mobilization
4.3 Preparation atWellsite
4.4 Operations
4.5 Post Job Wellsite Procedure
4.6 Demobilization
Chapter 5 Free Point Indicator SOP
5.1 Preparation at Base
5.2 Mobilization
5.3 Preparation atWellsite
5.4 Operations
5.5 Post Job Wellsite Procedure
5.6 Demobilization
Chapter 6 Bridge Plug Setting SOP
6.1 Preparation at Base
6.2 Mobilization
6.3 Preparation atWellsite
6.4 Operations
6.5 Post Job Wellsite Procedure
6.6 Demobilization
Chapter 7 Truck Preventive Maintenance 1 SOP
7.1 Preliminary Inspection
7.2 Inspection Front of Cab
7.3 Inspection Left Side of Cab
7.4 Inspection Lower Left Side of Recorder Cab
7.5 Inspection Left Side Tandem Wheels Area
7.6 Inspection Right Side Tandem Wheels Area
7.7 Inspection Right Side of Cab
7.8 Inspection Under the Vehicle
7.9 Inspection Under the Cab Cover
7.10 Inspection Insidethe Cab
7.11 Inspection Lighting
7.12 Trouble Shooting
Chapter 8 Truck Preventive Maintenance 2 SOP
8.1 Driving Inspection
8.2 Stationary Inspection
8.3 Engine Compartment Inspection
8.4 Tire And Wheel Inspection
8.5 Battery Inspection
8.6 Under Vehicle Inspection
8.7 Body Inspection
8.8 Air Conditioner Inspection
8.9 Safety Equipment Inspection
8.10 Air Cleaner Inspection
8.11 Fuel System Inspection
8.12 Auxiliary Generator Inspection
8.13 Hydraulic Inspection
8.14 Generator Inspection
Chapter 9 Truck Preventive Maintenance 3 SOP
9.1 Driving Inspection
9.2 Stationary Inspection
9.3 Engine Compartment Inspection
9.4 Tire And Wheel Inspection
9.5 Battery Inspection
9.6 Under Vehicle Inspection
9.7 Body Inspection
9.8 Air Conditioner Inspection
9.9 Safety Equipment Inspection
9.10 Air Cleaner Inspection
9.11 Raise Front End Inspection
9.12 Lubrication Inspection
9.13 Fuel System Inspection
9.14 Auxiliary Generator Inspection
9.15 Hydraulic Inspection
9.16 AT-355/aubum Transmission Inspection
9.17 Draw Works
9.18 Generator Inspection
Chapter 10 Wireline Conveyed Perforating SOP
10.1 Preparation at Base
10.2 Mobilization
10.3 Preparation at Wellsite
10.4 Operations
10.5 Post Job Wellsite Procedure
10.6 Demobilization
Chapter 11 Tubing Conveyed Perforating SOP
11.1 Preparation at Base
11.2 Mobilization
11.3 Preparation at Wellsite
11.4 Operations
11.5 Post Job Wellsite Procedure
11.6 Demobilization
Appendix 1 Depth Control Policy
Appendix 2 CNLC Fishing Policy
Appendix 3 Prevention of Sticking
Appendix 4 Quick Splice Instructions
Appendix 5 Square Knot (Reef Knot)
Appendix 6 Reverse Cut and Thread
Appendix 7 Crane Operation
Appendix 8 Wellhead Voltage Levels
Appendix 9 Radio Silence
Appendix 10 Power Shutdown
Appendix 11 TCP String
Appendix 12 Torque for Threaded Connections